The base decides how long the pour lasts
Most failed concrete in this valley did not fail because of the mix. It failed because the ground under it moved. We excavate to depth, remove soft material, and compact a crushed rock base in lifts so the slab is sitting on something that will not settle.
Where a slab is going over disturbed backfill or a slope cut, we account for that before we ever set forms. Getting this part right is far less work than tearing out a sunken driveway later.
